Details: Berths 401-404, APM Terminals, Port of Los Angeles, CA. Project Manager/Lead Electrical Engineer for the design of electrifying several RTG’s via an above ground 480V bus system, the first in the United States. Design work included verification of existing available infrastructure, pre-purchase of long lead equipment, permitting, construction administration, and relay coordination.
Photos - Click to enlarge.
POLB PIER G SHIPLOADER
Details: Pier B, Port of Long Beach, CA. Lead Electrical Engineer for the design of a floating dock system for the POLB maintenance department. Design work included verification of existing available infrastructure, permitting, construction administration, and relay coordination.
Photos - Click to enlarge.
ANACAPA
Details: Anacapa Wharf, Anacapa Island, CA. Lead Electrical Engineer for the design of a new concrete cantilevered pile supported wharf with generator as service to a manlift located on the wharf. The island is not fed from any utility and all electrical is either solar or diesel generator. Design work included verification of existing available infrastructure, permitting, construction administration, and relay coordination.
Photos - Click to enlarge.
APM RTG ELECTRIFCATION
Photos - Click to enlarge.
CSI ARC FLASH STUDY
Photos - Click to enlarge.
CSI ROLLING PIPE MILL
Photos - Click to enlarge.
LEEWAY
Details: Leeway Sailing Center, Long Beach, CA. Lead Electrical Engineer for the design of a new wharf and floating dock for the Leeway Sailing Center. Design work included verification of existing available infrastructure, verification of existing services, new SCE service for existing and new pier and dock lighting with LED decorative lighting for the Gondola Getaway operations building, permitting, construction administration, and relay coordination.
Photos - Click to enlarge.
USS IOWA
Details: Pacific Battleship Center, USS Iowa, Port of Los Angeles, CA. Project Manager/Lead Electrical Engineer for the design and development of construction documents to provide shore power, Alternative Maritime Power, for the USS Iowa. Design work included verification of the existing available infrastructure both on shore and on vessel, coordination of pre-purchase of long lead equipment, permitting, construction administration, and relay coordination, arc-flash and short circuit calculations and coordination with LADWP representatives to construct new service for the vessel.
Photos - Click to enlarge.
UNITED ROCK THICKENING SYSTEM
Photos - Click to enlarge.
PITTSBURG CA MARINA SOLAR EVALUATION
Photos - Click to enlarge.
WASTE MANAGEMENT MRF
Photos - Click to enlarge.
City of Carlsbad Rail Trail
Details: This is where you could give a brief write up of the project. Keep it short but explain what you did.
Breitburn Energy - Transformer
Details: This is where you could give a brief write up of the project. Keep it short but explain what you did.
Port of Oakland - Cranes
Details: This is where you could give a brief write up of the project. Keep it short but explain what you did.
Photos - Click to enlarge.
Portofino Marina
Details: Complete MEP Design Engineering and Project Management for new Marina.
Central California
Details: Wind Study
SA Recycling
Details: Regenerative Thermal Oxidizer installation for existing Automobile Shredder.
Photos - Click to enlarge.
Port of LA - Evergreen Terminal
Details: Removal of old ‘tree mounted’ reefer receptacles and replace with ‘bunker mount’.
Central California
Details: Complete MEP Design Engineering and Project Management for new Marina
SA Recycling
Details: Complete MEP Design Engineering and Project Management for new Marina